Major road opening within weeks after bridge 'needed to be demolished' impacting thousands of drivers
Sentiment Mix
Geography
Expert Signals
GB News - News
source • 1 mention
AI-Generated Claims
Generated from linked receipts; click sources for full context.
A crucial route for thousands of drivers every day is set to open within weeks after the previous bridge was demolished due to serious structural and safety fears.National Highways has confirmed that the A432 Badminton Road bridge over the M4 is set to open in June for the first time.The multi-million-pound bridge will open to non-motorised users, like pedestrians and cyclists, from the afternoon of Friday, June 19.Traffic management measures will be removed overnight to allow all vehicles to use the bridge from 7am on Saturday, June 20.
Supported by 1 story
TRENDING Stories Videos Your Say The A432 Badminton Road bridge was first closed in July 2023, after investigations revealed damage to the bridge which could not be repaired long-term or in a cost-effective manner.Preparation work launched in May 2024 when it was closed to motor traffic, but remained open for pedestrians and cyclists until it was demolished in March last year.National Highways outlined that the bridge required specialist working...
Supported by 1 story
Related Events
How the 76-day Homeland Security shutdown started, and how it ended
Security • 5/1/2026
Hamilton restaurant tied to salmonella outbreak allowed to reopen after re-inspection - FlamboroughToday.com
Uncategorized • 4/30/2026
Keystone XL revival a step closer after Trump authorizes Canada-Wyoming crude pipeline - The Globe and Mail
Uncategorized • 5/1/2026
Camp Mystic will not reopen this summer after withdrawing state license application - KUT
Open Source • 5/1/2026
'It's just ridiculous': Americans react to gas prices
Uncategorized • 4/30/2026